Report on tubewell construction at Paloh Hinai Pekan, Pahang Malaysian Soil Investigation Sdn. Bhd., 1981

By: Malaysian Soil Investigation Sdn. Bhd., 1981Material type: TextTextPublisher: 1981Description: Iv (various pagings) ill. 30 cmSubject(s): Hydrogeology -- Pekan -- PahangSummary: The aim of the project is to search for underground water for the comsumption of Paloh Hinai, Pekan. The work was carried out on instruction received from Jabatan Kerja Raya, Kuantan. One tubewell was constructed to a depth of 192'01''
Tags from this library: No tags from this library for this title. Log in to add tags.
    Average rating: 0.0 (0 votes)
Item type Current location Collection Call number Status Date due Barcode Item holds
Reports JMG IBUPEJABAT
Open Shelf
Open Shelf 551.4959512332 MAL (Browse shelf) Available 0000004471
Total holds: 0

The aim of the project is to search for underground water for the comsumption of Paloh Hinai, Pekan. The work was carried out on instruction received from Jabatan Kerja Raya, Kuantan. One tubewell was constructed to a depth of 192'01''

There are no comments on this title.

to post a comment.