Contruction of tubewells for groundwater extraction at 5th mile Gambang Road, Kuantan Pasific Industrial & Mining Sd. Bhd.
Material type:![Text](/opac-tmpl/lib/famfamfam/BK.png)
Item type | Current location | Collection | Call number | Status | Date due | Barcode | Item holds |
---|---|---|---|---|---|---|---|
Reports | JMG IBUPEJABAT Open Shelf | Open Shelf | 551.49595123 PAS (Browse shelf) | Available | 0000004473 |
Total holds: 0
The purpose and scope of investigation was to locate a suitable sand aquifer in the unconsolidated alluvium and develop its ground water potential so as to provide a filtered and bacteriologically free potable water having a combined design capacity of 40,000 gph from two production bores
There are no comments on this title.