Preliminary geological report on two quarry sites Raub, Pahang S.Y. Shu

By: Shu, S.YMaterial type: TextTextPublisher: 1970Description: 8 p. ill., photo, maps 30 cmSubject(s): Quarries and quarrying -- Raub -- PahangSummary: The Raub district has been earmarked for the development of a large centralised quarry to supply road metal and premix to all districts in west Pahang. At present there is a limestone quarry in operation in the area and it is located at the southern margin of Bukit Serdam.
Tags from this library: No tags from this library for this title. Log in to add tags.
    Average rating: 0.0 (0 votes)
Item type Current location Collection Call number Status Date due Barcode Item holds
Reports JMG IBUPEJABAT
Open Shelf
Open Shelf 622.3559512323 SHU (Browse shelf) Available 0000004687
Total holds: 0

The Raub district has been earmarked for the development of a large centralised quarry to supply road metal and premix to all districts in west Pahang. At present there is a limestone quarry in operation in the area and it is located at the southern margin of Bukit Serdam.

There are no comments on this title.

to post a comment.