Mineral clearance of the proposed Bakun hydroelectric project reservoir area, Belaga, Sarawak Enggong Aji, Ajon Winnie

By: Enggong AjiContributor(s): Ajan WinnieMaterial type: TextTextPublisher: 1991Description: iii, 29 p. ill. 30 cm+ 5 mapsSubject(s): Mineral industry -- Belaga -- SarawakSummary: The main objective of the investigation was to assess the mineral potential of the area, before the area could be released for the implementation of the proposed hydroelectric project.
Tags from this library: No tags from this library for this title. Log in to add tags.
    Average rating: 0.0 (0 votes)
Item type Current location Collection Call number Status Date due Barcode Item holds
Reports JMG IBUPEJABAT
Open Shelf
Open Shelf 553.3095952262 ENG (Browse shelf) Available 0000005059
Total holds: 0

Includes bibliographical references

The main objective of the investigation was to assess the mineral potential of the area, before the area could be released for the implementation of the proposed hydroelectric project.

There are no comments on this title.

to post a comment.