A preliminary geological report on the proposed Sg. Piah hydro-electric project Ulu Perak no. E(f)3/1983 Salim Suratman
Material type: TextPublisher: 1983Description: 24 p. ill. 30 cm + 2 mapsSubject(s): Geology -- PerakSummary: This report has been prepared as a geological reconnaissance survey of a proposed tunnel line for the Lembaga Letrik Negara Sg Piah hydro-electric project. The proposed tunnel line is approximately 16.5 km long and comprises 2 stages of diversion and power tunnelsItem type | Current location | Collection | Call number | Status | Date due | Barcode | Item holds |
---|---|---|---|---|---|---|---|
Reports | BPT General Stacks | Open Shelf | C 621.9 SAI E(F) 3/1983 (Browse shelf) | Available | |||
Reports | JMG IBUPEJABAT Open Shelf | Open Shelf | 550.595114 SAI (Browse shelf) | Available | 0000005304 |
Total holds: 0
Browsing BPT shelves, Shelving location: General Stacks, Collection: Open Shelf Close shelf browser
A 333.7 GAR GP06 Garis panduan pemetaan geologi terain Geological terrain mapping | C 621.9 ABD E(F) 2/1983 Geology of Kenering and Bersia damsites | C 621.9 SAI E(F) 2/1984 A preliminary geological report of the proposed Sg. Pelus hydro-electric project, Perak | C 621.9 SAI E(F) 3/1983 A preliminary geological report on the proposed Sg. Piah hydro-electric project Ulu Perak | C 621.9 ZAH E(F) 3/1984 Baturuntuh di lebuhraya Ipoh-Changkat Jering | D 553.4 KHO NM 4/1989 Summary report on the tin potential of the tin potential of the Klian Intan area upper Perak peninsular Malaysia : RAK (D2) & RAK (D3) |
Includes bibliographical references
This report has been prepared as a geological reconnaissance survey of a proposed tunnel line for the Lembaga Letrik Negara Sg Piah hydro-electric project. The proposed tunnel line is approximately 16.5 km long and comprises 2 stages of diversion and power tunnels
There are no comments on this title.