Mineral clearance of the proposed Bakun hydroelectric project reservoir area, Belaga, Sarawak Enggong Aji, Ajon Winnie
Material type:
Item type | Current location | Collection | Call number | Status | Date due | Barcode | Item holds |
---|---|---|---|---|---|---|---|
Reports | JMG IBUPEJABAT Open Shelf | Open Shelf | 553.3095952262 ENG (Browse shelf) | Available | 0000005561 |
Total holds: 0
Includes bibliographical references
The main objective of the investigation was to assess the mineral potential of the area, before the area could be released for the implementation of the proposed hydroelectric project.
There are no comments on this title.