Report on hydrogeological investigation at Kampung Siwak Jaya, Bakam, Miri division, Sarawak GSKL 037/26/351 Ismail Tawnie, Yusuf Bujang
Material type: TextPublisher: Kuala Lumpur Minerals and Geoscience Department Malaysia 2001Description: II, 19 p. col., ill., maps, photos 30 cmSubject(s): Hydrogeology -- Miri -- SarawakSummary: One tube well of 4@(SJMF5) was constructed during the hydrogeological investigation at Kampung Siwak Jaya, bakam. The transmissity, T was 1,336-8.142 m/2 day, the well efficiency E was 67.4% and the well can be pumped at 2.3 km hourItem type | Current location | Collection | Call number | Status | Date due | Barcode | Item holds |
---|---|---|---|---|---|---|---|
Reports | JMG IBUPEJABAT Open Shelf | Open Shelf | 551.495952281 ISM (Browse shelf) | Available | 0000005870 |
Total holds: 0
Browsing JMG IBUPEJABAT shelves, Shelving location: Open Shelf, Collection: Open Shelf Close shelf browser
Includes bibliographical references
One tube well of 4@(SJMF5) was constructed during the hydrogeological investigation at Kampung Siwak Jaya, bakam. The transmissity, T was 1,336-8.142 m/2 day, the well efficiency E was 67.4% and the well can be pumped at 2.3 km hour
There are no comments on this title.