Report of hydrogeological investigation at Rumah Ujeh, Pasai Sibu division, Sarawak GSKL 037/25/349 Yusuf Bujang, Mohd Zailon Ramli
Material type: TextPublisher: 1999Description: 6 p. ill.,map 30 cmSubject(s): Hydrogeology -- Sibu -- SarawakSummary: One 4@ diameter tube well with total depth of 102 m into Belaga Formation was able to discharge water at 1.2 m3/hr. This well was constructed by Geological Survey of Malaysia, Sarawak, located at Rumah Ujeh, Pasai, Sibu divisionItem type | Current location | Collection | Call number | Status | Date due | Barcode | Item holds |
---|---|---|---|---|---|---|---|
Reports | JMG IBUPEJABAT Open Shelf | Open Shelf | 551.495952251 YUSru (Browse shelf) | Available | 0000006100 |
Total holds: 0
Includes bibliographical references
One 4@ diameter tube well with total depth of 102 m into Belaga Formation was able to discharge water at 1.2 m3/hr. This well was constructed by Geological Survey of Malaysia, Sarawak, located at Rumah Ujeh, Pasai, Sibu division
There are no comments on this title.