Report of hydrogeological investigation at Rumah Ujeh, Pasai Sibu division, Sarawak GSKL 037/25/349 Yusuf Bujang, Mohd Zailon Ramli

By: Yusuf BujangContributor(s): Mohd Zailon RamliMaterial type: TextTextPublisher: 1999Description: 6 p. ill.,map 30 cmSubject(s): Hydrogeology -- Sibu -- SarawakSummary: One 4@ diameter tube well with total depth of 102 m into Belaga Formation was able to discharge water at 1.2 m3/hr. This well was constructed by Geological Survey of Malaysia, Sarawak, located at Rumah Ujeh, Pasai, Sibu division
Tags from this library: No tags from this library for this title. Log in to add tags.
    Average rating: 0.0 (0 votes)
Item type Current location Collection Call number Status Date due Barcode Item holds
Reports JMG IBUPEJABAT
Open Shelf
Open Shelf 551.495952251 YUSru (Browse shelf) Available 0000006100
Total holds: 0

Includes bibliographical references

One 4@ diameter tube well with total depth of 102 m into Belaga Formation was able to discharge water at 1.2 m3/hr. This well was constructed by Geological Survey of Malaysia, Sarawak, located at Rumah Ujeh, Pasai, Sibu division

There are no comments on this title.

to post a comment.