Mineral clearance of the proposal Bakun hydroelectric project reservoir area, Belaga, Sarawak Enggong Aji & Ajon Winnie

By: Enggong AjiContributor(s): Ajon WinnieMaterial type: TextTextPublisher: 1994Edition: RevDescription: 1v. (v.p) ill., maps 30 cmSubject(s): Bakun Hydroelectric Project | Hydrology -- Sarawak -- Belaga | Water-supply -- Sarawak -- Belaga | Belaga (Sarawak)Summary: The mineral clearance project over the proposed Bakun Hydroelectric Project Reservoir area was carried out by the Geological Survey of Malaysia upon the request of Sarawak Electricity Supply Corporation (SESCO)
Tags from this library: No tags from this library for this title. Log in to add tags.
    Average rating: 0.0 (0 votes)

GSKL 138/1/(12)

The mineral clearance project over the proposed Bakun Hydroelectric Project Reservoir area was carried out by the Geological Survey of Malaysia upon the request of Sarawak Electricity Supply Corporation (SESCO)

There are no comments on this title.

to post a comment.