Laporan kajian indeks kerja (Wi) dan kebolehkisaran (Grindability) pengisar bebola Salmah Badaruddin, Ismail Ibrahim, Md.Muzayin Alimon.

By: Salmah BaharuddinContributor(s): Ismail Ibrahim Md Muzayin AlimonMaterial type: TextTextPublisher: 2005Description: 27 p. ill. 30 cmSubject(s): MineralogySummary: Kajian indeks kerja (Wi) di bangunkan bertujuan untuk membantu pihak industri mineral didalam mereka bentuk litar untuk proses pengisaran.
Tags from this library: No tags from this library for this title. Log in to add tags.
    Average rating: 0.0 (0 votes)
Item type Current location Collection Call number Status Date due Barcode Item holds
Reports JMG IBUPEJABAT
Open Shelf
Open Shelf 549.09595 SAL (Browse shelf) Available 00003000
Total holds: 0

Includes bibliographical references

Kajian indeks kerja (Wi) di bangunkan bertujuan untuk membantu pihak industri mineral didalam mereka bentuk litar untuk proses pengisaran.

There are no comments on this title.

to post a comment.