Prospecting for bauxite in Sematan district

Material type: TextTextDescription: 2 p. 30 cmSubject(s): Bauxite -- Sarawak | SarawakSummary: Prospecting work wa carried out from 9th - 23rd May, 1981 and covered those areas which were left out during the first field-trip. A hand auger with a total penetration depth of 21 feet (6.4m) was used in the investigation work. A total of 17 samples were collected for analysis.
Tags from this library: No tags from this library for this title. Log in to add tags.
    Average rating: 0.0 (0 votes)
Item type Current location Collection Call number Status Date due Barcode Item holds
Reports JMG IBUPEJABAT
Open Shelf
Open Shelf 553.492609 PRO (Browse shelf) Available 00003560
Total holds: 0

Prospecting work wa carried out from 9th - 23rd May, 1981 and covered those areas which were left out during the first field-trip. A hand auger with a total penetration depth of 21 feet (6.4m) was used in the investigation work. A total of 17 samples were collected for analysis.

There are no comments on this title.

to post a comment.