An investigation of the Guning Sumalayang Limestone Johore W. Sminson
Material type: TextDescription: 20 p. map 30 cmSubject(s): Limestone -- Johore | JohoreSummary: The work was carried out in the period July 18th to August 22nd, 1970. The aim of the project was to investigate a known limestone occurrence on Guning Sumalayang, situated some 17 miles north-west of Kota Tinggi (Fig.1), toestablished wether a commercially exploitable deposit occured in the area.Item type | Current location | Collection | Call number | Status | Date due | Barcode | Item holds |
---|---|---|---|---|---|---|---|
Reports | JMG IBUPEJABAT Open Shelf | Open Shelf | 553.51609119 SMI (Browse shelf) | Available | 00003563 |
Total holds: 0
The work was carried out in the period July 18th to August 22nd, 1970. The aim of the project was to investigate a known limestone occurrence on Guning Sumalayang, situated some 17 miles north-west of Kota Tinggi (Fig.1), toestablished wether a commercially exploitable deposit occured in the area.
There are no comments on this title.