Quarry site investigation Gunung Paun Binong Tebakang Serian Lam Sia Keng
Material type: TextPublisher: 1982Description: 2p. ill.,maps 30cmSubject(s): Quarries and quarrying -- Sarawak -- Gunung Paun Binong | SarawakSummary: Gunung Paun Binong is the aunderlain by limestone of the Bau Limestone.It is a 100m high conical hill. The Limestone occurs as pinanacles on the lower slopes. The rock surface is rather irregular and sinkholes and underground cavities are common.On the higher slopes,Steep cliff faces,30 to 50m higher along the western and southern slopes.Item type | Current location | Collection | Call number | Status | Date due | Barcode | Item holds |
---|---|---|---|---|---|---|---|
Reports | JMG IBUPEJABAT Open Shelf | Open Shelf | 555.952222 LAMgpb (Browse shelf) | Available | 00003955 |
Total holds: 0
Browsing JMG IBUPEJABAT shelves, Shelving location: Open Shelf, Collection: Open Shelf Close shelf browser
555.95222 LUQ Pemetaan geologi terain kawasan Ranchan, Serian, bahagian Samarahan, Sarawak | 555.952222 EDW Pemetaan geologi terain kawasan Slabi, Serian, bahagian Samarahan, Sarawak | 555.952222 LAMgj Quarry site investigation Gunung Jengat Serian | 555.952222 LAMgpb Quarry site investigation Gunung Paun Binong Tebakang Serian | 555.95223 JAI Progress report | 555.95224 SUL Sarikei-Pakan area, central Sarawak, Malaysia explanation of sheet 1/111/3 and 2/111/15 | 555.95224 SUL Quarry site investigation Sungai Biban, Tatau, 4th Division, Sarawak |
Gunung Paun Binong is the aunderlain by limestone of the Bau Limestone.It is a 100m high conical hill. The Limestone occurs as pinanacles on the lower slopes. The rock surface is rather irregular and sinkholes and underground cavities are common.On the higher slopes,Steep cliff faces,30 to 50m higher along the western and southern slopes.
There are no comments on this title.