Progress report on the reconnaissance roadstone and construction stone investigation along the Bintulu-Miri road,Sarawak Gasah Ak Lingkai

By: Gasah LingkaiMaterial type: TextTextPublisher: 1987Description: 26p. ill,maps 30cmSubject(s): Engineering geology -- Sarawak | Building Stones -- Sarawak | Quarries and Quarrying -- Sarawak | SarawakSummary: This progress report summaries the findings of reconnaissance survey undertaken along the Bintulu-Miri Road sector of the project 'source of the Sri Aman-Sibu-Miri Trunk Road
Tags from this library: No tags from this library for this title. Log in to add tags.
    Average rating: 0.0 (0 votes)
Item type Current location Collection Call number Status Date due Barcode Item holds
Reports JMG IBUPEJABAT
Open Shelf
Open Shelf 553.50959522 GAS (Browse shelf) Available 00003960
Total holds: 0

This progress report summaries the findings of reconnaissance survey undertaken along the Bintulu-Miri Road sector of the project 'source of the Sri Aman-Sibu-Miri Trunk Road

There are no comments on this title.

to post a comment.