Brick clay site investigation lot 202 Block 29 Kemena land district Victor Hon
Material type: TextPublisher: 1980Description: 2p. ill, maps 30 cmSubject(s): Geology -- Sarawak -- Bintulu | Clay Mineral -- Sarawak -- Bintulu | Bintulu(Sarawak)Summary: The quality of bricks will be enhanced if certain measures are taken during the clay preparation stage. These include the screening off of organic material, hard lateristic crusts and other hand fragments, blending of the clay from the different horizons and grinding and serving of the clay.Item type | Current location | Collection | Call number | Status | Date due | Barcode | Item holds |
---|---|---|---|---|---|---|---|
Reports | JMG IBUPEJABAT Open Shelf | Open Shelf | 553.61095952271 HON (Browse shelf) | Available | 00003963 |
Total holds: 0
Browsing JMG IBUPEJABAT shelves, Shelving location: Open Shelf, Collection: Open Shelf Close shelf browser
553.6109595225 CHE Brick clay site investigation-Ju Tak Enterprise Sibu | 553.61095952253 JAP Clay in the Mukah area, Sarawak | 553.6109595226 KLO Brick clay site investigation at Binatang lease 41500 Sg. Tulai Binatang | 553.61095952271 HON Brick clay site investigation lot 202 Block 29 Kemena land district | 553.61095952271 LAM243 Brick clay site investigation lot 243 Block 28 Kemena Land district | 553.61095952271 LAMk Brick clay site investigation lot 291 Kemena land district Bintulu | 553.61095952271 SUL Brick clay site investigation lot 203 mile 6 1/2 Bintulu Ulu Mukah road Bintulu area |
The quality of bricks will be enhanced if certain measures are taken during the clay preparation stage. These include the screening off of organic material, hard lateristic crusts and other hand fragments, blending of the clay from the different horizons and grinding and serving of the clay.
There are no comments on this title.