Projek Kajian Sumber Air Tanah Negara Laporan Bersepadu RMKE-9 Hasnida Zabidi, Nizarulikram Abdul Rahim

By: Hasnida Zabidi, Nizarulikram Abdul RahimContributor(s): Nizarulikram Abdul RahimMaterial type: TextTextPublisher: Johor JMG (Johor), Kementerian Sumber Asli dan Alam Sekitar 2010Description: iii, 18ms ill,. col,.maps,.photo 30cmSubject(s): Groundwater -- Johor
Tags from this library: No tags from this library for this title. Log in to add tags.
    Average rating: 0.0 (0 votes)

Peruntukan RMKe-9:RM2,824,080.00,Tarikh mula projek: 1 Januari 2006, Tarikh siap projek: 31 Disember 2010, No. Projek: P23 11900 001

There are no comments on this title.

to post a comment.