Stone potential for quarrying at Lambir B Estate, Sungai Bakong, Baram, Miri Division, Sarawak / No. Laporan: JMG.SWK.(GK)017/22/424 / Rengga Anak Gendang
Material type:
Item type | Current location | Call number | Status | Date due | Barcode | Item holds |
---|---|---|---|---|---|---|
Reports | JMG SARAWAK | Available |
Total holds: 0
Includes bibliographical references.
At the request of Dato Henry Lau Lee Kong, Executive Chairman of Bintulu Lumber Development Sdn. Bhd., Miri, Sarawak, a quarry site investigation was carried out from 5th to 9th November 2012 over Lambir B Estate areas, Sungai Bakong, Miri Division, Sarawak to assess the suitability and quantity of rocks available for use as roadstone and other constructional purposes.
There are no comments on this title.