Laporan PPM R016/2018 : Laporan Kajian Teknologi Hijau Di Bukit Besi : Kajian Penggunaan Pokok Vetiver Untuk Fitoremediasi Menggunakan Floating Platform For Plantation, Disember 2018 Abdullah b. Hussin

By: Abdullah b. HussinMaterial type: TextTextPublisher: Perak Pusat Penyelidikan Mineral, Jabatan Mineral Dan Geosains Malaysia 2018Description: 16 p. col.,ill: 29 cm
Tags from this library: No tags from this library for this title. Log in to add tags.
    Average rating: 0.0 (0 votes)
Item type Current location Collection Call number Status Date due Barcode Item holds
Reports PPM
Report
Report Available
Total holds: 0

There are no comments on this title.

to post a comment.

Click on an image to view it in the image viewer