Laporan PPM K010/2022: Laporan Bengkel (Hand-On) Penubuhan Dan Penyelenggaraan Plot Tanaman Di Kawasan Bekas Lombong Bijin Timah Di Stesen Ujian Galian, Malim Nawar, Perak SIRI 2 24 Mei 2022 Fauziah Bt. Muhamad Isa
Publisher: Ipoh Pusat Penyelidikan Mineral, Jabatan Mineral Dan Geosains Malaysia 2022Description: 7 p. ill., some col. 29 cmItem type | Current location | Call number | Status | Date due | Barcode | Item holds |
---|---|---|---|---|---|---|
Reports | PPM Report | Available |
Total holds: 0
There are no comments on this title.