Laporan PPM R010/2008: Reaktor Prototaip Bagi Pembuatan Kalsium Karbonat Termendak, Ogos 2008 Abd Rahman b. Abd Aziz
Material type: TextPublisher: Perak Pusat Penyelidikan Mineral, Jabatan Mineral Dan Geosains Malaysia 2008Description: 13 p. ill.; some col. 29 cmItem type | Current location | Call number | Status | Date due | Barcode | Item holds |
---|---|---|---|---|---|---|
Reports | PPM Report | Available |
Total holds: 0
Includes bibliographical references
There are no comments on this title.