Laporan PPM L005/2019 : Laporan Lawatan Ke Tapak Solar Farm (30MW) Syarikat Gading Kencana Development Sdn. Bhd., Di Kawasan Bekas Lombong, Bidor, Perak 11 November 2019 Mohd Zaid b. Md Sharif

By: [Mohd Zaid b. Md Sharif]Contributor(s): [Norinsafrina bt Mustaffa Kamal, Abdullah b. Hussin]Material type: TextTextPublisher: Perak Pusat Penyelidikan Mineral, Jabatan Mineral Dan Geosains Malaysia 2019Description: 6 p. col, ill., photo 29 cm
Tags from this library: No tags from this library for this title. Log in to add tags.
    Average rating: 0.0 (0 votes)