Laporan PPM R020/2014 : Laporan KPI Ketua Pengarah JMG Suku Tahun Keempat 2014 , Tajuk R&D : Kajian Teknik Penanaman Mampan Untuk Pemulihan Kawasan Kuari, Disember 2014 Abdullah b. Hussin

By: [Abdullah b. Hussin]Material type: TextTextPublisher: Perak Pusat Penyelidikan Mineral, Jabatan Mineral Dan Geosains Malaysia 2014Description: 6 p. graf, chart, ill., 29 cm
Tags from this library: No tags from this library for this title. Log in to add tags.
    Average rating: 0.0 (0 votes)
Item type Current location Collection Call number Status Date due Barcode Item holds
Reports PPM
Report
Report Available
Total holds: 0

There are no comments on this title.

to post a comment.

Click on an image to view it in the image viewer