Laporan PPM L001/2020: Laporan Lawatan Dan Kerja Lapangan Di Kilang Terracotile Kapar, Klang, 23 Julai 2020 (Record no. 24184)

000 -LEADER
fixed length control field 00634nam a22001577a 4500
001 - CONTROL NUMBER
control field 0000000054
003 - CONTROL NUMBER IDENTIFIER
control field OSt
005 - DATE AND TIME OF LATEST TRANSACTION
control field 20240729161424.0
008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION
fixed length control field 201104b ||||| |||| 00| 0 eng d
040 ## - CATALOGING SOURCE
Transcribing agency Pusat Penyelidikan Mineral, Jabatan Mineral Dan Geosains Malaysia
100 ## - MAIN ENTRY--PERSONAL NAME
Relator term Muhammad Azammuddin b. Ahmad Fauzi
245 ## - TITLE STATEMENT
Title Laporan PPM L001/2020: Laporan Lawatan Dan Kerja Lapangan Di Kilang Terracotile Kapar, Klang, 23 Julai 2020
Statement of responsibility, etc. Muhammad Azammuddin b. Ahmad Fauzi
260 ## - PUBLICATION, DISTRIBUTION, ETC.
Place of publication, distribution, etc. Perak
Name of publisher, distributor, etc. Pusat Penyelidikan Mineral, Jabatan Mineral Dan Geosains Malaysia
Date of publication, distribution, etc. 2020
300 ## - PHYSICAL DESCRIPTION
Extent 6 ms
Other physical details ill, col, photo
Dimensions 29 cm
942 ## - ADDED ENTRY ELEMENTS (KOHA)
Source of classification or shelving scheme
Koha item type Reports
Holdings
Withdrawn status Lost status Source of classification or shelving scheme Damaged status Not for loan Collection code Permanent Location Current Location Shelving location Date acquired Total Checkouts Date last seen Price effective from Koha item type
Available         Report PPM PPM Report 29/07/2024   29/07/2024 29/07/2024 Reports