Laporan PPM L001/2020: Laporan Lawatan Dan Kerja Lapangan Di Kilang Terracotile Kapar, Klang, 23 Julai 2020 Muhammad Azammuddin b. Ahmad Fauzi

By: [Muhammad Azammuddin b. Ahmad Fauzi]Material type: TextTextPublisher: Perak Pusat Penyelidikan Mineral, Jabatan Mineral Dan Geosains Malaysia 2020Description: 6 ms ill, col, photo 29 cm
Tags from this library: No tags from this library for this title. Log in to add tags.
    Average rating: 0.0 (0 votes)
Item type Current location Collection Call number Status Date due Barcode Item holds
Reports PPM
Report
Report Available
Total holds: 0

There are no comments on this title.

to post a comment.

Click on an image to view it in the image viewer