Report of hydrogeological investigation at Kpg. Butir, Bekenu, Miri division, Sarawak GSKL 037/23/(319) Yusuf Bujang, Mohd. Zailon Ramli
Material type: TextPublisher: 1998Description: 6 p. ill., map 30 cmSubject(s): Hydrogeology -- Miri -- SarawakSummary: A 6'' diameter tube well with depth 95.7m into Lambir Formation was able to discharge water at about 1.0 m3/hr. This well was constructed by Geological Survey of Malaysia, Sarawak, located at Kpg. Butir, Bekenu as part of the projects under Seventh Malaysian Plan. The tube well was later converted into use for the people at Kpg. Butir or as a supplement source for the Sg. Kejapil during the low flow periodItem type | Current location | Collection | Call number | Status | Date due | Barcode | Item holds |
---|---|---|---|---|---|---|---|
Reports | JMG IBUPEJABAT Open Shelf | Open Shelf | 551.49592281 YUS (Browse shelf) | Available | 0000006073 |
Browsing JMG IBUPEJABAT shelves, Shelving location: Open Shelf, Collection: Open Shelf Close shelf browser
Includes bibliographical references
A 6'' diameter tube well with depth 95.7m into Lambir Formation was able to discharge water at about 1.0 m3/hr. This well was constructed by Geological Survey of Malaysia, Sarawak, located at Kpg. Butir, Bekenu as part of the projects under Seventh Malaysian Plan. The tube well was later converted into use for the people at Kpg. Butir or as a supplement source for the Sg. Kejapil during the low flow period
There are no comments on this title.